How do i get a verizon cell phone tower on my property,find address with phone number in france,phone tracker free blackberry link - Reviews

admin | Category: Telephone Number Search | 04.04.2014
Hotel signs and gas station sings along with billboards are often time high enough to provide coverage required by a carrier's RF engineering department. Smoke stack May 18, 16 10:25 AMI have a warehouse with an unused smoke stack thati is probably 50-75 feet tall. The Planning Board granted unanimous approval to a proposal from Verizon Wireless to collocate 12 antennas on an existing 130-foot electric transmission tower near Carpi Lake late last month. This high-tension utility tower off Morsetown Road is anticipated to be the home of a new cellular array, after the West Milford Planning Board approved variances for the project on Jan. According to Verizon Wirelessa€™ New York metro area representative David Samberg, the project along West Milforda€™s Morsetown Road is needed to both expand the networka€™s coverage area and increase the areaa€™s existing capacity to accommodate additional cellular phone users and traffic. To execute the improvements to the wireless network, the company plans to install a 13-foot platform on top of an existing high-tension transmission tower. Property and tower owner Public Service Electric & Gas (PSE&G) will perform the work on the tower itself, while another company will be hired to prepare the area under the tower for the placement of a pre-fabricated equipment shelter, according to Anthony Suppa, the consulting professional engineer for the applicant. Suppa said the 240-square-foot building will be lifted in by crane, in one or two sections, and probably "slid" into place due to the close proximity to high-tension, high-voltage power lines.
Its final resting place will be a 22- by 33-foot compound surrounded by an 8-foot-tall fence with an interwoven, artificial screening device, according to Suppa.


The projecta€™s environmental consultant, Chris Lanna, said there are no wetlands in the area to deal with, adding that the project as proposed is exempt under Highlands Act regulations. Despite the utilization of an existing utility tower that already has a height variance, the plan had to come before the West Milford Planning Board due to the need for variances for fence height and setbacks. The one-story equipment shelter will be within the 200-foot right of way underneath the tower, allowing the compounda€™s 726-square-foot footprint to rest entirely within the 3,540-square-foot tower base, according to Suppa. However, noting the concern for fire safety, the board examined the possibility of expanding the roadway 25 percent, which would be the allowable limit under the state Highlands Act.
As conditions of approval, the Planning Board will require Verizon representatives to post a performance bond to account for any damage to Morsetown Road, use tracking pads to keep debris from entering the roadway, maintain a€“ and plow a€“ a 12-foot-wide gravel road and any drainage devices deemed necessary by the board engineer.
The company must also provide the board with written confirmation from the state Department of Environmental Protection that permits are not needed for this project or any necessary permits, even though Board Engineer Paul Ferrieroa€™s colleague John Hansen noted any violation of wetlands or Highlands regulations would be the responsibility of the developer to correct.
If the antennas and the equipment shelter are abandoned, municipal code requires that the equipment be removed or the township will remove it at the ownera€™s expense after six months.
BlackBerry, Android smart phone, and iPhone users use more capacity than wireless customers have used in the past.
The platform will support a total of 12 antennas, according to Samberg, which will raise the overall height of the utility tower by 5 feet.


State Board of Public Utilities regulations prohibit landscaping in the transmission line right of way. The legislation, passed in 2004, has strict regulations on new development in the region but permits some construction under utility towers.
Although the West Milford Fire Prevention Bureau requested widening the access road from 12 to 20 feet, later saying 18 feet would be acceptable, the board did not require any widening of the road.
However, it was unsure if 15 feet would be considered a necessary improvement over 12 feet, taking into account the need to remove dozens of trees to widen the road and the planned installation of an automatic, chemical fire suppression system in the pre-cast concrete shelter.
In addition, company representatives are mandated to attend a pre-construction meeting to examine the schedule, material delivery route, and start date.
Still, the applicanta€™s legal counsel Michael Beck, from Hiering, Dupignac, Stanzione, Dunn & Beck in Toms River, said that PSE&G requires immediate removal in the event that the antenna array is no longer in operation.



Reverse lookup gps coordinates
Cell phone number hayes grier kik
White pages telephone directory auckland weather


Comments »

  1. | Azeri — 04.04.2014 at 17:54:43 This info up to date for difficult her presence.
  2. | Krasavcik — 04.04.2014 at 12:18:47 The police, and i have taught our.
  3. | O_R_K_H_A_N — 04.04.2014 at 13:25:36 Gjerne sende meg directories will maintain their databases often blocking, even.