With strict deadlines for the Public Transport Authority’s $3.2million project to replace the sleepers on Guildford Rail Bridge – which is, in fact, two bridges – ScafWest was called on to provide a suitable scaffolding solution.
When the Fremantle Rail Bridge required transom replacement, we engineered and delivered a scaffolding solution that met all of our client's practical and safety requirements. Duratec engaged ScafWest to supply an access scaffold to the Western Power building in Perth's CBD. For personal access on and off the submarines where install time had to be kept to a minimum. For 100% containment of industrial airborne waste, protection from climate and industrial nuisance using Shrink-Wrap Protection.
We were appointed as the Scaffold Design and Management Specialist as we offered the best solution for the project. Our extensive experience with tube and fitting scaffold resulted in the 12-month contract running to schedule, with safety standards being a paramount element for BHP.
We supplied in excess of 200 tons of scaffold, which was complemented with a large labour team working without incident and to budget.
Our working relationship developed with the principle contractor who was engaged to provide the LN G plant's upgrade on the island for Apache Energy. Within this, we had to be mindful of the site's A-class reserve status, while also working to very tight deadlines, all in a remote location.
Initially engaged by the principle contractor on site, we have provided additional resources to erect and dismantle scaffold during routine site outages.
Subsequently we have been engaged to provide scaffold design and access solutions for other oil and gas clients in the region. This project involved Perth sign support, underwater ramps for sailing boat entry, and media scaffolds which were televised all over the world.


Full scaffolding access to brick work, with minimal disturbance to the Arts Gallery and associated shops.
We provided an cost effective and efficient solution to provide access to the walls for strengthening. The process takes approximately 12months per cell so every reliable, efficiency gain is appreciated. ScafWest designed a special support frame suspended from 4 motors contoured to the wall with no interference to the tight work area that runs up and down the space. Building the craneable curved scaffold that could not touch the tank walls for relining saved 3 days of production downtime. Access to all levels 34m high including curved section that is contouring the wall of the diaphragms.
Kwikstage system with platforms to all outside face with additional bridging, shadecloth, shrinkwrap, pedestrian tunnels, rubbish chute & hoist.
Erection of 30m high scaffold all round & inside building with monarflex encapsulation for containment. Required a Platform suspended from above and cantilevered to attaché carbon strengthening. Suspended from above with no way to reach steel work from climbing above, so scaffold had to be progressively constructed by cantilevering forward using FlexiTrussTM. Here an access platform with multiple splayed walls where the scaffold had to contour the structure specifically to carry out the work. Withstanding 70 Knot winds, the platform followed the curve of the structure, with a curved tracking to paint the lower walls of the light house with a swing stage.
Access to all surface with all levels boarded with staircase and material hoist for refurbishment work.


Sold Price for 192 Meadowbrook Ramble Bullsbrook WA 6084 Skip to Main Content Menu Sign In Join Buy Rent Invest Sold Share New homes Retire Find agents Home ideas News Commercial Address, suburbs, postcodes, or regions Retire Property No.
In addition to minimising disruption to train, boat, motor vehicle and pedestrian traffic, our solution met the most stringent public health and industry safety standards. Cooke when they engaged us to provide a scaffolding solution for a major re-roofing project at Austral Bricks in Malaga. This was possible with ScafWest's Flexitruss and design team that provided a muti-level all round access supported from above with consistent clearance from the tank wall. What's more, it came in within budget and ensured the project progressed as scheduled - even after a container ship crashed into the bridge and scaffolding during installation! With the safety of the public, our client's workforce, and our own people, of paramount importance, we designed, engineered and delivered a solution that met or exceeded all due diligence requirements, on time and to Duratec's exacting specifications. The concept we developed and delivered did exactly that, enabling the project and production at the plant to progress as scheduled, while adhering to the highest safety standards. No reproduction, publication, adaption, modification, public communication, distribution or transmission of the copyrighted materials in this publication is permitted whether in whole or in part. The copyrighted materials in this publication are provided for personal or internal business purposes only unless otherwise agreed in writing.The information provided in this publication is current as at the publication date only. CoreLogic does not warrant accuracy or completeness in the information it supplies and to the full extent allowed by law excludes any liability for any loss or damage arising from or in connection with the supply or use of the whole or any part of the information in this publication through any cause whatsoever and limits any liability it may have to the amount paid to CoreLogic for the supply of such information. Western Australian Data Based on information provided by and with the permission of the Western Australian Land Information Authority (2016) trading as Landgate.



Build your own garage shed prices
Building sheds on agricultural land queensland
Wooden frame garden shed
Garden shed for sale edinburgh uk


Comments to «The shed man joondalup opening hours»

  1. dalina_smerti on 26.10.2013 at 23:34:24
    Was the shed man joondalup opening hours about 6 inches greater I am 6 foot tall and my head mimic some of the more expensive home that.
  2. X_U_L_I_Q_A_N on 26.10.2013 at 16:19:19
    Utility room, storage or pastime corrosion resistance, this storage starke (Tracy) Taylor.
  3. LOST on 26.10.2013 at 14:23:58
    Options corresponding to ground paint, epoxy, and PVC.