Summary: A DIY guide to laying a garden shed base, including how to use formwork and shuttering for concrete.
How to build a shed base for your garden shed is a very popular question to diydoctor and in all honesty there are a number of ways to do it.
We have chosen a standard construction method which allows for a damp proof membrane under the slab to stop damp rising up through it. For small sheds this could be dug into the ground removing the need for any brickwork around the edges. A basic run down of the process is to dig the hole 300mm wider and longer than your shed floor, 100mm deep (providing the ground underneath is solid) and pour the concrete onto a damp proof membrane you have laid inside the base of the hole. However you build your shed base you need to make sure the ground is level over the area of the entire base. For the above ground method, you first need to decide if your ground is firm enough to lay a slab without a hardcore sub-base.
If the ground is firm enough and the peg is difficult to drive into the ground then carry on with the instructions below. If the peg goes in too easily then remove 4 inches of soil for an area of ground which is 500mm wider and longer than the floor of your shed and fill this with scalpings.
It is necessary to compact the scalpings before adding the concrete so that they are as tightly packed as possible.
In the diagram above, the damp proof membrane, which should be at least 1000 gauge polythene, is shown going under the formwork (frame) for the base. Using 150mm x 25mm sawn and treated timber, cut the four sides of the formwork for your base. When the posts are banged in you need to use a spirit level to make sure the top of the formwork is level. There is no need to use large nails or screws as the concrete will hold the boards in place. To make sure the angles of your formwork are at 90 degrees, measure from corner to corner across both diagonals - the measurements should be identical. With a level and square frame in place you can now lay 25mm of soft building sand in the bottom. Stand the timber upright on its edge and push and pull it backwards and forwards across the frame while dragging it from one end to the other and this will level it roughly. This vibrates the concrete into place and it will find its own level - This is called tamping (See image below for an example). Lastly, have a wander around the frame tapping gently on the outside all the way round with a clawhammer. While the concrete is going hard, without disturbing the posts (of which there should be at least 300mm in the ground) dig a small trench all the way around the base, right next to the frame, about 5 inches wide and 2 inches deep. This brick wall serves two purposes, it holds the damp proof membrane up so no ground water can seep between the underside of the slab and the membrane and it also gives a much better looking side to the slab. We are assuming this base is for keeps so you want it to look good as well as being completely functional!
Keeping the polythene held up, lay two courses of bricks around the base (For tips and help on doing this see our laying bricks and blocks project here). Lay the top course of bricks with any frog (brick indent) facing down so that you have a nice flat top.
Point up the brickwork (see our pointing and repointing brick and blockwork project for help) and you should have a good looking base for your shed - Good work!! There are no hard and fast rules, so this is really up to you and how you want your finished shed and base to look. For a practical demonstration on how to use a vibrator plate compactor, go to our video section on foundations here. Bedroom windows require 42-44” above finished floor to the opening, depending on local AHJ.
17,000 dryer fires a year, when did you last clean the inside of the dryer near motor or the exhaust ducting? Bedroom windows require 42-44? above finished floor to the opening, depending on local AHJ.
I was under the impression what i was doing was platform framing, and are you saying instead of my beam being one piece to separate it two pieces one for each floor? An earlier picture showed multiple rims at the post (gable) end wall, which would be required if the gable wall was framed up without a rafter supporting that roof load including the overhang load. Concrete is often overlooked as a potential pavement surface, mostly because of its lack of colour or interest, although the decorative patterned concrete is becoming more popular and cementitious overlays offer a huge range of colours, patterns and textures. Plain concrete can be very useful in areas where a decorative look is not required, such as caravan hardstandings, shed and garage bases or dog kennels. Modern concrete technology has led to the development of fibre reinforced concretes that create high-strength pavements without the need for steel reinforcement mesh.


Given good ground, mass concrete can be placed directly onto a damp-proof membrane over the prepared sub-grade. Concrete paths should be 75-100mm thick, whereas drives, garage bases or hardstandings should be at least 100mm thick. The purpose of the dpm is two-fold: Firstly, to protect the underside of the slab from attack by dampness and aggressive salts (such as chlorides) or other chemicals in the sub-base or sub-grade, and damaging the concrete, unseen, from beneath. Any 'laps' required in the membrane should overlap by at least 350mm, and preferably be taped down to prevent ingress of ground water or egress of mix water. Reinforcement in concrete is used to ensure that the cracking which always occurs does not threaten the structural integrity of the concrete. Movement joints (expansion joints, contraction joints, isolation joints, crack control joints, etc.) are used with concrete slabs to protect the slab itself from cracking, to accommodate the inevitable movement of the slab and to prevent excessive forces being transmitted to adjacent structures. A shovel or a strong rake is used to roughly level out the wet concrete, and then a straight-edged timber can be used to tamp down the concrete to the correct level. Vibrating poker units can be used to expel most of the unwanted air pockets, and so-called 'Bug Rollers' are useful for making sure any hard aggregate is pushed into the concrete, although this is more important on PIC than plain concrete. For larger projects, Hire Centres can supply Vibrating Beam Screeds and Roller Strikers that are dragged over the roughly levelled out concrete, vibrating it to eliminate air pockets, pushing surplus concrete in front of the beam, and levelling, all in one operation. A reasonably smooth surface can be obtained by repeatedly tamping wet concrete, but for a finer finish, the surface should be smoothed using a steel float trowel. Judging exactly when to commence floating, either with hand tools or with a power float, is an art in itself, and is gauged from years of experience; too soon and the trowel marks will never disappear, too late and the concrete might not 'rub-up' to a close finish. A perfectly smooth concrete surface can become quite slippy, especially outdoors in wet or icy conditions. On light-use applications, such as driveways, garage bases and the like, there is a tendency to leave the concrete, once the finishing has been done, to harden and cure at its own pace. Temperature control is only a serious issue when there is a risk of the ambient temperature falling below 4°C. In winter, freshly poured concrete may be protected with hessian sacking, straw or polystyrene to insulate the slab overnight. Formwork and shuttering can be removed from a concrete slab after 24 hours, although it is often left for 3 days unless there is a need to examine the edges.
The keeled garage slab cross-section is provided as an example of a typical detail and NOT a recommendation. Pre-fabricated sectional garages can often be erected on a simple 150mm slab, such as that shown above; this keeled slab is the type of raft foundation that may be used with a single brick construction garage.
Whilst not the most attractive type of pavement, a well laid concrete area should give many years of maintenance free service. Not only do we show you how to build a concrete shed base but we also show you how to get it smooth and level and also include a damp proof membrane.
To do this get a 50mm x 50mm post and without sharpening the end try and drive it into the ground.
They are a little more expensive than broken brick hardcore but much much easier to lay and compact.
If not then over time they could move and slump, removing the support for the concrete and causing it to crack as there is no support from below. It should, in all cases, be 300mm longer and wider than your shed floor and as level as possible. These posts will obviously hold the timber on its edge, but more importantly are for stopping the timber bowing out as you place the concrete.
Using a piece of timber laid across the top of the frame and concrete (with one person at either end of the timber), wiggle it about to get the top of the new base level. Next, lift the board at both ends about 4 inches above the frame and tap it back down on the frame, moving up and down the frame as you do so. The bricks are for decoration but if they are well laid it doesn't matter if the shed sites on them too, going right to the edge, as the decorative part of the brick is its face. We work with Checkatrade to ensure that we recommend only reliable and trustworthy tradesmen. Is the center (gable ends) piers rated for the portions of roof loads as they appear to be same size sono-tubes, perhaps the footings are bigger for the loads? With a full rafter carrying the roof loads, the rims will carry the wall and gable end framing, as well as some floor loads. Your local ready mixed concrete supplier will advise on the most suitable type and strength of concrete for your project. For heavier applications, or on bad ground, it may be advisable to construct a sub-base of compacted granular material or lean-mix concrete beneath the actual concrete slab, or to lay a sub-base over a geo-textile.
To calculate the required amount, simply multiply length in metres by width in metres by depth in metres to calculate a volume in cubic metres. Tamping helps eliminate air pockets being trapped in the body of the concrete and also helps to push the hard aggregate into the concrete, bringing sufficient of the matrix to the surface to make smoothing (floating) easier.


3 or 4 passes with a beam screed is usually sufficient to give an acceptable finished level, with a tolerance of ±6-10mm.
This is best done when the concrete has started to stiffen as part of the hardening process, as the float trowel leaves fewer trowel marks. It is recommended that once the surface has been smoothed with the float trowel, light brush strokes be made over the surface, transverse to the direction of travel, to improve traction once the concrete hardens. It is usually checked after 10-12 hours, just in case any immediate repairs or 'rubbing-up' is required, and while this may be satisfactory for small jobs, larger slabs, especially those where the final strength is critical, require careful management of the critical first stages of curing if they are to meet their design targets. It is unusual for concrete to be poured in harsh weather conditions, that is, when the ambient temperature is below 4°C and falling, unless there are extenuating circumstances. Care must be taken when striking the formwork to avoid damaging the concrete which will still be 'green', as we call it in the trade.
Although reinforcing fabric mesh is not essential in concrete slabs, it does strengthen the concrete and is something we always recommend.
Next, lay the polythene inside the frame (on top of the sand) and fold as tightly as possible into the corners.
Don't need the extra end rim joists unless the gable rafters will be pieced in, not continuous to carry the roof load and overhang load.
By combining plain concrete with a decorative edging, such as a brick edging, it can be made to look quite attractive.
On soft or unreliable ground conditions, a sub-base will help spread the load of a mass concrete slab, but in such conditions it's best to obtain a professional opinion from a civil or structural engineer.
Concrete slabs intended for exceptional loads, such as commercial yards, lorry parks etc., will be at least 200mm thick and should be specifically designed as they will probably require a sub-base of at least 100mm thickness, and steel reinforcing mesh or a fibre-reinforced concrete. Builders' merchants normally carry 'visqueen' or PIFA 1200 as an off-the-shelf product, as it is much used throughout the construction industry. Ready mixed concrete companies usually deliver in multiples of half-cubic metres, so "round-up" your calculated quantity accordingly.
The ready mixed concrete supplier will understand these references, and the delivery wagon usually carries extra water that can be mixed into the concrete before pouring, if the mixture is too stiff. Hand floats, also known as Bull Floats, are fine for small areas where a near-perfect finish is not essential. Additional space heating may be provided in such situations to keep the ambient temperature above the 4° threshold. In most cases, a concrete slab should be kept completely free from all traffic for the first 48 hours. Fibre reinforcement may be used in place of, or in addition to, the steel mesh in the plain slabs.
In building deck stairs, the most common material is made of wood board, there is also some made of steel or concrete brick. If the area of the paving is troubled with weeds, it may be necessary to treat the excavated sub-grade with a general weedkiller such as Sodium Chlorate, but it is unlikely any weed will be able to penetrate the upper layers. However, bear in mind that adding further water to the prepared mix can affect the cured strength of the finished concrete and may invalidate the strength guarantee of the supplier, leaving the contractor responsible for any remedial work. Long-reach floats can be used on larger areas, and for that perfectly smooth finish, a power float is the tool for the job. After that, foot traffic can be allowed onto the slab, with care, but it should not be open to heavy foot traffic or slow-moving vehicles until 5 days after pouring.
The 100mm thick slab normally has a single sheet of mesh, while 150mm and thicker slabs will have two layers of mesh, "top and bottom", each with at least 50mm of cover.
These are awkward, heavy machines, available from Hire Centres, but are not recommended for use by DIY'ers. For heavy usage, such as highways, runways, ports or commercial yards, it may be 10 days before the slab is ready to take traffic. A wood board will look artistic, steel will look sturdy but creates a noisy step, and a concrete brick just looks sturdy but lacking artistic side.Here, in building deck stairs, you can choose the basic material freely depends on your liking. Using wood as deck stairs is a pretty good option, because not only it is easier to build than any other materials, but it is also much easier to maintain. And it will even easier to decorate, especially when you want to do a paint job and many other kinds of decoration.
But just keep in mind that maintenance is should be put into a priority, because weather and termite is the natural enemy for any material made of woods. Then if the material is made of concrete brick, you can build it by your own using your shovel. This type of material also needs less maintenance compared to others; your only job is just doing not let it crumble down by the rain and other hard material.



Jewelers workbench plans 4x4
Portable woodworking power tools 8.1

how to build a raised concrete shed base quote



Comments to «How to build a raised concrete shed base quote»

  1. GemliGiz writes:
    Publications together with Backyard and Gun, Better Properties.
  2. Hooligan writes:
    And Simple Concepts For Wooden Shed motion pictures, so you can transfer them.