Shed ramp stringer cut chart,prefabricated sheds montreal,storage space running out oppo find mirror - Try Out

We have a lot of great information about sheds covering everything from building a foundation to characteristics of a high-quality shed.
One aspect we haven’t covered is building a shed ramp so I was glad to help a friend build a ramp for his shed a couple of weeks ago. The framing of the shed has a little lip underneath the door, and to begin, we ripped a 2 x 4″ so that our ledger board would mount flush with the face of the shed.
Making sure it was completely level, we anchored the 2 x 6″ ledger board underneath the shed doors with lag screws (and washers).
We used a 2 x 4″ to estimate a comfortable slope for our ramp, and we staked out an area just big enough to fit the concrete blocks. We used paver base to help set and level each block, making sure everything was straight and tight. While my friend began working on the ramp stringers, I screwed a 2 x 4″ along the bottom side of the ledger board. We measured the distance from the ledger board to the far edge of the concrete blocks and cut our stringers to length. To determine the angle between the stringer and the ledger board, we set the stringer at the corner of the support board and used a speed square to mark a plumb line. After setting the stringers, we cut and screwed blocking between them to maintain the spacing.


We used a powder actuated nailer to drive a few nails through the blocks into the concrete to prevent any side-to-side movement. We cut the deck boards to length, predrilled holes and screwed the boards to the stringers. My friend painted the entire ramp to match his shed, and this has the added benefit of another protective layer. Subscribe and never miss an article!Free articles delivered conveniently to your inbox(and no spam, we promise)Enjoy this?
All of these shed posts over the last few months makes me really want to get going on building my own. Looking really good – have you thought about covering up the sides to try and prevent little creatures creating their homes underneath? The top of the ramp is about 1″ below the floor level, and that sits just underneath the doors.
What’s the purpose of the ledger board – any reason not to just attach either the support board or joist hangers right to the band board? Next, setting the stringer on the support board and using a piece of scrap, we scribed a line for the angle between the stringer and the block. For the last couple of boards, we drilled through the stringer and into the concrete (using concrete anchors).


I love reading about all the different sheds and this one about adding a ramp is fantastic. Surely when you mark the line and cut the stringer it will drop to meet the pavers and be below the support board on the ledger? Got a question on your own project?Ask your question in our Home Improvement Help Forums.Otherwise, leave a note here!
We follow pro remodelers as they tackle tough renovations, developing step-by-step guides based on their real-life experiences.
Thinking back, we should have marked the locations for our ramp stringers beforehand to ensure the lag screws wouldn’t be in the way.
I would not go any less than this because I have about an inch with the mower deck set on next to highest setting.



Wood pallet living room furniture
Wooden playhouses lancashire

shed ramp stringer cut chart



Comments to «Shed ramp stringer cut chart»

  1. mulatka writes:
    I requested for a storage door opener.
  2. Stilni_Oglan writes:
    Storage shed constructing plans as an alternative, then buy stained wooden to deliver out the.
  3. NoMaster writes:
    Print, distinction trim and enough behind the.