Shed roof felt nail spacing,suncast storage sheds costco quebec,home depot woodworking projects 8th - Try Out

Replacing split and worn roofing felt shed is an important task you need to do if you want your garden equipment, tools and other appliances to stay in good condition. If nail heads break off, hammer the nails deep into the surface of the wood so that you dona€™t have sharp points that can rip new felt protruding.
Roofing shingles come in strips that are generally about 3-feet long and 8 or 10 inches wide. Flat roof re-felting or laying flat roof felt from scratch is not as difficult as most people think. You might also consider brushing on some some solar paint to reflect the sun and to make your flat roof last longer.
As with any chemical based product such as adhesives and solar paint, always read the instructions before use and wear gloves to protect your hands. At Nottingham Roof Repairs, we have over 20 years experience of flat roof re-felting and felting.
Are you one of those persons who likes to organize their things neatly and in a particular order?
If you don’t have the luxury of time, it’s better to hire a local handyman to do it for you. This video shows a quick summary of the shed building process using my regular gable roof shed plans. This video shows building a 12x20 shed using the same plans, but with the optional 8 ft sidewalls. These plans include dimensions to build a wooden storage shed or garden shed in 21 different sizes from 8x4 to 12x20 as listed across the top of Table 1.
Once you have decided what size shed you want to build, purchase the number of items shown below your chosen size in Table 1. Ask your building supply store for their estimate for fasteners as you are purchasing the lumber. Otherwise the differences are the length and number of components you will need, as detailed in Tables 2 and 3.
When a Figure show a letter ("A", "B", "C" etc.), you can find this dimension in table Table 2. This might add a little additional time to your shed building project but it will make construction much easier for the novice builder. Using pre primed 4x8 sheets of composite hardboard siding will allow you to build your shed in the least amount of time and for the least amount of money. This will save you the step of applying a base coat of primer and your paint job will last longer. If your building supply store doesn't sell no groove siding then just use regular grooved siding.
You might need building permits to build a shed in your area so check with your local building department before you get started.
The construction techniques in these plans might not meet building codes in your area as they vary around the country. But the building departments are usually very helpful and will let you know exactly what their requirements are. Even though I have build thousands of sheds like this with no problems, I make no guarantees about the structural integrity of this shed. The main function of your sheds foundation is to transfer the weight of your shed and its contents to the ground.
When necessary can protect your shed from movement resulting from frost heave, water or wind. A simple skid foundation consists of two pressure treated runners laid parallel on the ground.
This is a lot cheaper than a concrete slab and has the added benefit of keeping your shed portable should you ever want to move it in the future.
Pressure treated means that the skids are rated for long term ground contact and are resistant to water rot and termite damage. Pressure treated wood is usually some shade of green as a result of it's chemical treatment and is labeled with a tag to identify it as being pressure treated.
If your site is not level then place concrete blocks under each skid every 4 feet or less and build the low points up with more blocks and wedges until the skids are approximately level. Don’t worry about getting the skids perfectly level at this point because you'll make the final level when the floor frame is complete.
If drainage is a problem you can dig a trench under each skid about 12 inches wide and 12 inches longer than the length of your shed, fill it with gravel and place your skids on top.
If you expect to have a problem with your shed moving from frost heave, water or wind, or if it's required by building codes in your area you can tie your shed down.
If you need to then just skip over to my shed tie down posts to see what you need to do before you begin the next step, which is building the floor.
In the absence of building codes and with moderate weather you should have a pier at each corner, about 12 inches in diameter and going down 24 to 36 inches into the ground.
Before you sheet your floor you can add some metal straps or H25's to tie the skids to the floor joists for extra security. It's important that you build the foundation tall enough to keep the siding away from the ground where moisture and termites will damage your shed. How deep you go will depend on building codes, frost level and if you will have animals trying to dig under your foundation to get in or to escape.
And make sure it's level and square then secure the wood perimeter frame to the uprights with galvanized metal straps.
Don't worry about tying the individual perimeter pieces together because once you tie the shed in, that will tie all the foundation pieces together. Attach the shed walls to this perimeter frame with 3 inch nails or screws through the bottom plate and galvanized 8d nails every 8 inches through the siding overhang. As an option you can install more pressure treated wood below ground level to keep animals from digging under the walls. This can be a footer with a concrete block stem wall or a mono pour with the footer and stem wall made at the same time. Attach the shed walls to the stem wall with j-bolts embedded in the concrete 12 inches off each corner then 48 inches on center. The top of the stem wall should be 5 inches above ground level minimum, which makes a 4 inch gap from the ground to the bottom of the siding when using a 1 inch siding overhang. If you live in an exceptionally wet area or have a major termite problem you might want to use pressure treated wood for the entire floor including the skids, the floor joists and the plywood sheeting.
This will add to the initial cost of your shed but it might also save you money in the long run because a floor built with pressure treated lumber will last longer in these areas. See Figure 2: Cut your band boards and floor joists and lay out the band boards for 16 inches on center and drill two pilot holes for each 2x4joist, or three holes for each 2x6 joist. Extra blocking on 10 & 12 wide floors: If you're using regular CDX plywood as opposed to tongue and groove you should provide some extra support where the full pieces of plywood meet the cut pieces. To make these blocks cut 12 inches off the ends of some of the 2x4's that you will be using for studs.
Snap a chalk line across the floor every 16 inches using the screw heads on the band boards as a guide.Nail the center of your sheeting along the chalk lines every 8 inches. Make the trusses now because you'll need two of them to build the gable end walls in the next step.
It’s important that all your trusses be the same height and width so that the ridge line of your new shed will be symmetrical.
Make a jig: Place two pencil marks eight feet apart on the edge of the unused 2x4 top plate. Drill a pilot hole in one of the pointy ends of every other truss piece so you can toe nail them together at the top joint.
Assemble trusses: Put the ends of two truss pieces into the jig and press everything together.
Position a collar beam parallel to the jig and screw it to the truss with four screws on each side.
Make a pencil mark on the floor along the top of the truss so you can compare the rest of your trusses to this mark as you build them. After you have built all the trusses you can double check them by standing them up on end and measuring the distance from the floor to the peak of the truss. If you're going to build your shed on a concrete slab read this post to learn about anchor bolt placement and to find out how to make your shed 3 inches taller.
You'll want to build the shorter walls first so you can move them aside and use the floor space to build the longer and heavier walls in place. If not go to Step 4b and build the sidewalls first, move them aside, then come back here to build the gable end walls in place. See Figure 4a and Table 2:Measure and cut the wall studs and plates for the gable end walls.
Frame The Gable End Walls: Lay the wall studs on the floor spaced 24 inches apart and attach each stud to the top and bottom plates with two 3 inch screws or 16d nails.
Sheet The Walls: Make sure the siding is square to the frame with 4 inches overhanging below the bottom plate. Build The Second Gable End Wall: If you're going to put a door in this wall then proceed to Step 5 for instructions on how to frame a door into this wall. Make sure you build the sidewalls with the short side of the stud on the outside of the wall where the siding will be nailed. If you are going to put a door in one of the side walls then proceed to Step 5 for instructions on how to frame a door into this wall. Top Cut Line: Measure and mark from the bottom of the siding and snap a chalk line to mark the top cut line.


Build the second sidewall: Leave this finished wall in place and build the next wall directly on top of it. Now that all the walls are complete you might want to paint the walls and trim while you can work on them laying horizontally. This door construction method saves time and materials because you are using the materials cut out from the rough opening that would otherwise be thrown away. You will make an outer frame which is built in the wall and the inner frame which is the actual door.
But if you make double doors you will have the additional width without the potential door sagging problem.
If you plan on using your shed for motorcycle parking then you might want to make the door about 60 inches wide. To make the door wider or narrower just adjust the length of the door header to give your desired rough opening size then add or subtract the same amount to the horizontal cross pieces and horizontal trim pieces.
Otherwise just add an additional vertical upright to the inner door frame where the siding breaks.
Cut six) 3x3 inch spacers from the triangular scraps of siding you trimmed from the gable ends. Put the spacers loosely inside the outer frame, 2 into both top corners and one along the side of each bottom corner. Measure and record the distance from the center of the middle stud to the inside edge of the rough opening in both directions. Put a single nail in the center door cross piece and top door cross piece, and in the top plate. Place a pencil mark at the top and bottom of the siding half the rough opening width plus ? inch in either direction (from the measure you took above just before you installed the first piece of siding). Measure from the top of the siding to the mark you made ? inches above the bottom of the door header and transfer this measurement to both ends of the wall and snap a chalk line. Measure from the top of the siding to the middle of the door center cross piece as evidenced by the nail heads. Measure and cut a piece of trim to fit between the two vertical cut lines at the top cut line.
Measure and cut two vertical pieces to run from the bottom of this piece to the bottom edge of the siding. Position the middle piece of trim so that it's centered on the chalk line and nail it down the middle. Position the bottom piece of trim so the lower edge lies on the bottom plate chalk line and nail ? inches from its top edge.
Lay a piece of trim horizontal along the top two spacers and another piece vertical along the other three spacers and pull them tight into the spacers.
Move the three spacers to the other vertical trim piece and measure, cut and install the same way. If a wall doesn't line up with the floor then put a car jack under the floor and raise it up to fit the wall. If your shed is slightly out of square at the end of all of this, don't worry as it will not be enough to notice.
In my shed building business I have special pulling straps and jacks for this purpose because sheds never come together perfectly without a little "assistance". Add a brace if necessary: Put a 16d nail in the center of the back of the wall and add a temporary 2x4 brace to the ground if necessary. Second sidewall:Raise the other sidewall and nail the corner joint and across the bottom of the siding into the floor frame.
Last gable end wall:Move the last gable end wall into place and nail up and down the corners then nail across the bottom. Caution:Which ever wall contains the door, don't nail across the bottom of the door because that will be nailing it shut.
Second cut: Finish cutting across the top of the door where you left off and cut and down the latch side to the bottom edge. Remove bottom plate: And finally, use a hand saw to cut the bottom plate out of the door opening between the door frames. Framing the roof consists of attaching the trusses to the top plates then nailing the roof sheeting to the trusses.
You should also nail through the sidewall siding into the ends of each truss to secure the roof structure to the rest of the shed.
The wall studs and trusses are both 24 inch on center so just align the end of a truss up with the stud under the top plate and it will be in the correct position.Make sure the truss is pushed tight against the siding and run a 3 inch screw through the bottom plate into the truss on both sides of the stud.
The other end: If the other end of the truss doesn't fit tight against the siding you can hook the ends of a cargo strap over the siding on either wall and gently pull the walls together until they fit tight to the ends of the truss. Then run a 3 inch screw through the bottom plate into the truss on both sides of the stud like before. Split the truss with the opposite edge of the sheeting and nail into the truss at the top corner. See Figure 8: Measure and mark the truss spacing for the rest of the trusses and nail with a single nail at the top of the truss at 24 inches on center. Measure the end truss spacing from the outside edge of the end trusses to the center of the closest truss, not including the siding (from the joint of the siding and the truss).
Stagger the seams: Nail the large sheets for the other side along the top of the trusses only, but stagger the seams if possible for a stronger shed. Nail bottom edge: Check that the bottom edges of the sheeting are properly aligned with the trusses. If they don't align properly that means either that the floor isn't level or the walls are not square. The cure is to put a jack under one corner of the shed and lift it until the sheeting comes into proper alignment. Continue jacking different corners of the shed until you get all the pieces of roof sheeting in proper alignment and nailed in place.You might have to re-level or re-block your shed at this point.
Snap a chalk line to identify the underlying trusses and nail the sheeting in place with 8d nails every 8 inches. Secure siding to trusses: Nail two 8d nails from the outside through the sidewall siding into both ends of each truss to further secure the roof structure to the rest of the shed. Nail 1 piece of trim A and B to each of the gable ends starting at the top center.They will overhang quite a bit but you will trim them to fit later. Make sure the top edge of the trim lines up with the top surface of the OSB and not with the top edge of the siding. Take a piece of trim C and hold it firm to the bottom of the OSB and to the front gable trim piece.
Installing shingles on the roof of your shed might seem complicated but it's easy if you take it one step at a time.
The glue strip on this starter row will hold the tabs of the next row of shingles in place.
Begin the starter row with a full shingle, then cut half a tab off every other row of shingles. This way every joints where the shingles come together will be covered by a full tab above it.
Stack some shingles along the ridge line and install the shingles from the bottom eave up to the top.
Start the shingles from the front of the shed and work to the back because the starting edge will be neater and less ragged than the edge you cut to fit. Use a utility knife, a straight edge and a cutting board to trim the last shingle in each row to fit. Measure each end of the row every few rows to make sure they aren't getting narrower or wider. Use your utility knife and straight edge to cut a stack of shingle tabs to nail along the ridge cap. Whether done intentionally or accidentally, when termites find a path into the un treated wood of your shed they will make themselves at home and do damage to the wood long before you ever notice their presence. After your shed is 3 to 6 months old, walk around it with a hammer and inspect for nails heads that are popping up.
After awhile you might notice your door latch doesn't line up properly and you have to struggle to close the door. If and when this happens then jack up one corner of the shed until the door comes back in line and re block your shed.
PLEASE NOTE: The instant download link will be delivered to the email address associated with your PayPal account or your credit card. Subscribe To Our Newsletter!Join our mailing list to receive the latest news and updates from the HomeTips team.
Wear safety gloves and goggles to protect yourself from grit and felt bits that throw off when moving old felt. Strip off the roof after you have removed all the nails and hammered into the wood any nails with broken heads. But if anything goes wrong, it’s usually because the felt has been cut too short, or at the edges. Even if you are a dab hand at DIY, it maybe worth giving us a call if you have never attempted flat roofing before. A wooden storage shed can be just an extra storage space or a nice little workshop where you can keep your equipment or gardening tools and putter around in. This can be accomplished either by yourself or you can hire a local handyman to do it for you.
One good way of knowing who to trust is to ask around your neighborhood for reliable handyman services.


If you decide to do it yourself, you can assemble one by using a shed kit or you can buy lumber and build your own. Shed plans can be downloaded online free of charge or you can pay for the better ones at very affordable prices.
I've included all 10 steps along with 2 introductory videos and a separate video for each step. Screws have better pulling power and can pull a twisted board into place better than a nail can. Also your nails or screws will not go astray because of the grain of the wood, nor will you have a problem with knots. You can cut the trim strips with a circular saw but your cuts will not be nearly as clean as with a table saw. If you don't have some of them likely you know someone who does who will let you borrow them for a week end or two. Don't trust the factory cuts because large pieces of dimensional lumber are usually ? to ? inches longer than stated.
The measurement for the skid spacing is measurement “D” in Table 2, and is shown on Figure 2: Floor Dimensions and Layout.
In addition you will need a concrete block support every 4 feet or less in between the piers. Measure from the bottom of the skid to the bottom of each hole and cut a pressure treated 4x4 pier 4 inches less than this measurement.
You can use a metal mending plate on each side, or a metal strap going over the top of the skid attached to either side of the 4x4 pier. When they are correctly positioned then fill the holes with concrete up to ground level and let them dry for a day or two. Remove the pressure treated wood perimeter frame and install the piers every 4 to 6 ft, as described previously. See Table 1 and Table 2: Get the number of floor joists you will need from Table 3, and the cut length for the band boards and floor joists and skid spacing from Table 2. Add or remove a little dirt or gravel under the skids until the floor is level.If necessary place a concrete block under each skid every 48 inches or less. Check the side edges for square along the frame and nail every 8 inches with 8d nails.Repeat with the second and third sheet, putting the worst sheet at the back of the floor. Leave about half of the block exposed.After you nail the smaller pieces of plywood in place then put screws on the other side of the joint to match. If they are all equal (or close enough), then you are finished and can disassemble the jig. Wide doors will be more of a maintenance problem because they are heavier and will sag more and sag sooner.
These are to keep the inside door frame from shifting until you get it nailed to the siding. Snap a chalk line along the top and bottom plates and along the top of the truss where you will trim it. Place the top edge of this piece at the top cut line and nail it ? inch from its bottom edge and within two inches of each end. Nail these ? inch from their inside edges from top to bottom to within two inches of the bottom plate chalk line. Lay two of these spacers along the top trim piece and the other three on the outside of the first vertical piece of trim. Then measure, cut and install a horizontal piece across the top of the two vertical pieces you just installed. If you skipped ahead to step 11 to paint the walls then you have already moved them off the floor and onto the ground.
Put a jack under a corner and raise it up till the roof sheeting comes in line with the truss.
The edge should align with the edge of the outside trusses or in the center of the inside trusses. Put plenty of nails at both edges of the sheeting, particularly where the sheets meets at a truss. This trim piece will be shorter than the OSB roof sheeting but that gap will also be covered by the metal flashing and shingles.
The better the paint the longer it will last which means time and money saved on repainting in the years ahead.
But over time the wood these fasteners are installed into will relax and the fasteners will loosen up.
So be pro active here and keep the screws or bolts tight so your door stays in proper align. Usually replacing any missing shingles and the proper application of a good quality caulk or roof coating will do the job.
Step 2: Replace damaged timber planks Check the exposed timber planks for damage, especially where holes in the felt were evident. There are also different types of underlay and flat roof felting that you can choose from, however lightweight shed roof felt is not really suitable for anything other than shed roofing. If you can’t find one, go online and search through the classified ads sites under home and garden services offered within your local area. Just remember that paid Internet shed plans should include a material list to give you a rough estimate on how much you are going to spend.
In fact I suggest that you borrow or rent a table saw if you don't have one because it will give you a much cleaner finished shed. Mark the ground where you will dig your holes about 6 to 8 inches from the end of the skids. This will allow enough room for concrete to flow under the bottom end of the pier to prevent wood to earth contact.
I recommend a minimum of 1 inch lower siding overhang to prevent water from seeping under the bottom plate. Snap a chalk line along the center of the top and bottom plates to identify those nail lines, and snap another line across the top of the truss and trim the excess siding. The studs on these sidewalls are cut with an angle on the top end and the length measurement is at the short side of the angle. These plates are 7 inches shorter than the overall wall length because they will sit inside the gable end walls. Lay the next piece of siding in place and put 4 nails in to match the nails in the other piece of siding. Then nail the top 6 inches in place.Take a piece of the front angle trim A or B and hold it in place flush to the edge of trim C and tight up to the gable end trim.
Felt rolls are rarely wide enough to cover the entire roof without having to cut more than one piece. If the floor is not level, the roof sheeting will not fit properly and you might have to re-level at that time. Put a few more skids underneath and more blocks under the skids making them closer together will add a lot of strength. If it happens on the outside, re touch the paint around the area that the nail head broke through. Leave about 5cm extra allowance at the edge of each felt piece you cut to allow joints to seal well. Paint is a barrier against the elements that keeps water and the sun from damaging the wood. This way the roof will still be symmetrical and you won't not have to waste or rebuild the less than perfect trusses. Smooth another felt piece over the very top of the shed and nail it into place between the two roof panels. 1To construct the framing for the shed’s floor, cut two pressure-treated 2 by 4s to a length of 6 feet for the rim joists. Then position six 45-inch-long floor joists between the rim joists 16 inches on center (with the exception of the last one, as shown in the floor joist detail at right). Attach them with 16d nails.Shed Floor Joist DetailCut two pressure-treated 4 by 4s to a length of 6 feet for the skids. Attach the wall to the floor frame and temporarily brace it.The front wall has a 6-foot-long top plate and two 1-foot-long bottom plates, leaving space for a 4-foot-wide door. Next, install the 73-inch-long jack studs, and then attach the 51-inch-long doubled header.
When all wall sections are square, attach them at the corners with screws.Lean-To Shed Rafter Dimensions3The frame of the roof consists of four 2-by-4 rafters cut so that they rest on the front- and rear-wall top plates, as shown in the rafter detail at right. Install a gable stud directly over the center studs on both side walls to fit between the end rafter and the top plate. 4Position pieces of T1-11 siding on the front and sides of the shed so that they are flush with the bottom of the rim joists.
Attach rake trim to cover the exposed edges of the roof sheathing, and install drip edging.
Test It Yourself:Subscribe To Our Newsletter!Join us for weekend projects and money-saving tips!




Sheds and garages bathurst 2014
Cheap sheds wigan

shed roof felt nail spacing



Comments to «Shed roof felt nail spacing»

  1. TIGER85 writes:
    Marked with X'shed roof felt nail spacing s, and the lastly, as you've gotten a good shelves "as is" because they.
  2. Roni_013 writes:
    Doing them ahead of time is way preferable to trying to working them sufficient to stop the other.