Disaster preparedness issues in the philippines,$99 bug out bag 2014,american movie 1999 full - How to DIY

Students investigate different kinds of disasters to develop an understanding of their causes, effects, and the types of assistance people and communities need to recover. In 2005 a 7.6 magnitude earthquake struck northern Pakistan killing nearly 75,000 people and destroying homes, schools and hospitals. Students begin to understand the range of disasters and their effects on people and the environment. Students develop an understanding of the preparation that can be done to limit the impact of a disaster. Students examine the effectiveness of emergency preparedness in saving lives in Indonesia’s earthquake-prone Nias and Mentawai islands. Students deepen their understanding of the causes and consequences of disasters, and investigate Australia’s work to reduce the risks faced by vulnerable communities.
While all Colorado voters receive a ballot in the mail, it is still vitally important to have centrally located Voter Service and Polling Center locations for voters who either need to vote in person with special equipment or simply prefer to cast their ballot in person. Voter Service and Polling Centers are places residents can drop off a mail ballot, cast a ballot in person, request a replacement ballot, register to vote or update registration information, or vote using equipment for persons with disabilities. The Colorado County Clerks Association will grant 4 regional one-time awards in the amount of $1,000 to seniors graduating from Colorado high schools to further their education at any university, college, junior college or technical institution. Financial aid awarded by the association will be remitted to the institution of attendance and will be credited to the student's account. Each district will select a finalist and forward their selection to the Executive Board by April 24, 2015. Any legal, permanent resident of Boulder County enrolled in, or applying to, a vocational training program or institution of higher learning in the State of Colorado as a full, or part-time student is eligible to apply. Scholarship announcements have been mailed to all high school offices in the eligible counties, and to all Colorado higher education institutions.
To finalize the election, as stated by law, the Boulder County Clerk prepared and made available to the public a statement of the total number of votes cast in the election for each candidate and for and against each ballot issue. Last week, Clerk Hall received word that the Secretary of State’s office accepted the official statewide abstract of votes cast for state races and issues.
Although some have raised questions about the effect of the canvass board’s prior decision not to certify, Clerk Hall says the election results stand. Because the margin of victory was so large in all of the races and ballot issues involved, no recount was triggered or requested. Composition of the canvass board: The canvass board is composed of two members from each of the “major” political parties plus the Clerk. 2014 Canvass Board Vote: This year, the canvass board signed off on the election audit, which tests the election’s vote tallying systems and processes to ensure accuracy, but in a 4-to-3 decision voted to not certify the election results.
Earlier this week, elections staff completed the 2014 election audit, a post-election quality assurance test that ensures the accuracy of the machine tally of votes.
Despite the fact that there were no documented discrepancies found in the audit or reconciliation that impacted the outcome of any contest, the Boulder County Canvass Board voted in a 4-to-3 decision to not certify the election. In regard to these actions, Boulder County Clerk and Recorder Hillary Hall had the following to say, “The Canvass Board’s decision not to certify is purely political, without basis and out of line with their role as defined by Colorado law. Hall continued, “The election judges and our staff did an outstanding job conducting the 2014 General Election. By Secretary of State Rule, if nothing found in the audit or reconciliation of the election impacts the outcome of the election, the results must be certified. The Canvass Report, Statement of Vote and audit documentation is now available at BoulderCountyVotes.org. The server upgrade will enhance maintenance and support of the Colorado State Titling and Registration system, which means better performance for the citizens of Colorado.
The Division of Motor Vehicles apologizes for any inconvenience due to this important maintenance work.
Boulder County also has three 24-Hour Ballot Drop Boxes that can be utilized overnight tonight and up until 7 p.m.
Voters who have returned their mail ballots can check BoulderCountyVotes.org to make sure their voted ballot has been received by the Boulder County Elections Division.
Additionally, for the public’s convenience, the Elections Division has added a new ballot drop-off location at the Lyons Town Hall.
Visit BoulderCountyVotes.org to view ballot content, see if your ballot has been processed if returned, or find more information about the election. Specifically, the recent news article mentioned the need for additional Republican Party election judges for Signature Verification roles. During each open house, Boulder County Clerk and Recorder Hillary Hall will give walking tours of the election wing approximately every 30 minutes as needed. These tours offer people interested in local elections the opportunity to see how ballots are processed, understand how signatures are verified on mail ballots, and learn about how ballot resolution works among other ballot processing procedures and safeguards. Also, any citizen who has resided in Colorado at least 22 days may register up to and including Election Day. Please visit BoulderCountyVotes.org to view ballot content, see if your ballot has been processed if returned, or find more information about the election. The main goal of a backup is to be able to recover data that has been lost either by accidental deletion, physical disk failure, or some other corruption. The secondary reason for a backup is to create an archive copy and thereby be able to restore previous version of a file. Keep in mind this, often overlooked, fact: The backup software and tape drive you use today need to be available and functional for as long as you plan to keep your data, should you ever need to actually restore your data. Replication – Within IT, and especially when discussing Disaster Recovery and Business Continuity, replication refers to the act to sending an exact copy of live data to another system or location. Replication can be synchronous or asynchronous – With synchronous replication, the data is sent to the other system or location in real time and the other system acknowledges the receipt of each piece of data.
Replication can be used to send backup data or live system data to a secondary failover location.
Business Continuity – While Disaster Recovery aims to allow an organization to recover its IT systems and data within a specified time frame that may be hours, days or even weeks, Business Continuity encompasses much more than just IT. A Business Continuity Plan (BCP) is usually developed from a Business Impact Analysis (BIA) that, depending on the size and complexity of the business, may take weeks and months to complete. DR is an important subset of BC, but DR is event-based and IT specific, whereas BC is a continual, ongoing process that encompasses people, buildings, supply chain, crisis communications, transportation, security, public relations, etc., etc. After the terrorist attacks of September 11, 2001 and the anthrax attacks in the fall of 2001, federal and state personnel provided response, recovery, and remediation under trying circumstances, including unprecedented demand on their capabilities to analyze environmental samples. In response, EPA formed the Homeland Security Laboratory Capacity Workgroup to identify and implement opportunities for near-term improvements and to develop recommendations for addressing longer-term laboratory issues. These certifications qualify our team to work in, around and supervise employees during clean-up operations required by a governmental body and OSHA whether Federal, state local or other entities involving hazardous substances that are conducted at uncontrolled hazardous waste sites as well as Emergency response operations for releases of, or substantial threats of releases of, hazardous substances without regard to the location of the hazard.
Commercial buildings, private and public facilities, processing plants and industrial sites affected by disasters have a need to out-source the technical components of their loss. When any electrical equipment has been infiltrated by water whether by flash flood or long term flooding, or has been sprayed, splashed, hosed, extinguished or has standing water in, on or around it, or housed in high humidity conditions or is sweating and or at the dew point it must be professionally assessed.
Indeed, it’s almost like getting an entirely new iOS device — not just for all the new features Apple has built into it, but because they’re all designed to hew to a single design vision and hit that intersection Cook describes above. It is true that many people tend to use these phrases in conjunction to an event, typically used in a setting where everyone asks “What happened?” In actuality the definitions of these terms don’t vary, but the parameters, scope, and process of how these words are defined for the individual customer or client changes.
This is essentially true, though I have a problem with the term “backup solutions”.  A raw backup of any files would just be an exact copy of that file. What this post neglects to point out, however, is that in every backup solution, there is a recovery solution that has to tie into the process. Flash rusting and corrosion enhanced by flooding and drying can be adverted with proper mitigation protocols. Fast action is the key to being able to restore sensitive electronics, equipment and electrical gear. NEMA’s Evaluating Water-Damaged Electrical Equipment, first published in 2004, contains excellent reference material to evaluate electrical equipment that has been exposed to water through flooding, firefighting activities, hurricanes, and other circumstances. The document provides a table summarizing recommended actions for various types of electrical equipment to determine whether they need to be replaced or reconditioned. For the first time in the healthcare industry in the United States, business continuity planning and disaster recovery capability will become mandatory for all healthcare organizations. Currently, healthcare providers in the US are visited approximately every three years (pressure is being exerted to make this more often and even surprise) by the Joint Commission on Accreditation of Healthcare Organizations (JCAHO), which grades the entire environment of care.
Medical centers in the US, especially in California, have well documented and well practiced emergency response plans. Definition of minimum acceptable level of service and detailed actions to get to that level. Voice communications recovery planning must be done related to the overall contingency plan as well as the specific critical business units.
In the 1980s, an inter-agency cooperative effort was formed to develop a common organizational system which fire protection agencies could use in response to a very large incident, as well as smaller, day to day operations. In 1987, the Hospital Council of Northern California completed work on an adaptation of ICS to hospital emergency response functions.
Responsibility oriented chain of command, which provides a manageable scope of supervision. Wide acceptance through commonality of mission and language in both the public and private sectors. Prioritization of duties with the use of Job Action Sheets, position job descriptions which have a prioritized list of emergency response tasks that promote documentation of the incident.
Applicability to varying types and magnitudes of emergency events, a flexible program which can be expanded or scaled back to meet the particular needs of a specific crisis. Thorough documentation of actions taken in response to the emergency, which may improve recovery of financial expenditures.
The HEICS structure is a chain of command which incorporates four sections under the overall leadership of the Emergency Incident Commander (IC).
There should be an Emergency Operations Center (EOC) and emergency management system in place that incorporates business recovery teams and the infrastructure necessary to support recovery. The intensity and frequency of major natural disasters is increasing, from 100 per year in the 1970s to more than 500 per year today, according to the Harvard School of Public Health. From hurricanes to fires and floods, ice storms and earthquakes, natural disasters are on the rise, and in no field is it more critical to be prepared than healthcare. While major disasters are a critical risk, the majority of business interruptions are caused by unforeseen circumstances – singular events that can’t be predicted, such as fires, power outages, and server failures.
This table is provided as a reference that can be used by both the health care staffing services (HCSS) firm and the reviewer. Eleven days before Valentine’s Day 2012, one of the biggest candy and confectionery holiday seasons of the year was seriously interrupted for our client by an early morning fire event. Another Pittsburgh favorite, Disaster Restoration Services of Pittsburgh (DRS), was called upon to help Sarris Candies with the restoration process.
At 7:30 AM on February 3, 2012 DRS received a call from the client and their insurance broker to help provide assistance and responded immediately. To appreciate the sensitivities and stresses of the specific project it is important that the size and scope of the loss be understood as well as the impact on the business. The immediate and quick response by DRS and their subcontractor Electro-Mechanical Recertifiers, Inc (ER) to treat various pieces of production equipment saved the insurance carrier roughly $700,000 to $900,000 in equipment replacement. The client had a primary core goal to get into business with the shortest path to recovery. Unforeseen Code upgrades and various changes to electrical and structural building components had to be dealt with. Joint approvals from the client and then the insurance company for selections, work approvals or extra charges can be a challenge and take valuable time to obtain. Original drawings were not always available and nor were stamped engineered drawings therefor engineering and architectural services had to be relied upon for current designs and subsequent client approvals and then submitted to local code officials.
Having multiple parties of experts show up and constantly ask questions sometime meaningful and other times seemingly redundant and how to accommodate that is a daily challenge. Finding hidden damages and items that need repaired as exposed to meet code and then having the carrier determine the validity of the upgrade or the coverage for an item can be a stressful especially when you are tempting to fast track a project.
Weekly meetings were held to review the work completed and the work in progress of the project.
DRS work with reliable engineers and architects that could produce drawings in a timely fashion to ensure proper cooperation with building code officials and the State of Pennsylvania’s Labor and Industry Department.
Times Observer photo by Brian FerryElectronic recertificationDipesh Pokhrel of Electro-Mechanical Recertifiers uses compressed air and a vacuum to clean ammonium phosphate dust and other contaminants from a keyboard from Youngsville High School. The clean-up is in response to damages allegedly resulting from vandalism by three former YHS students.
The initial estimate from the Warren County School District for this phase of the work was $238,000. The main problem in the school was the discharge of most of the fire extinguishers in the school and the resulting release of corrosive ammonium phosphate dust.
Each box is moved to the company’s mobile lab, ER-1, which is one of two trailers parked in the YHS parking lot. Because of the nature of the problem at Youngsville, those features will not be used on many devices there. Instead, Electro-Mechanical personnel will use compressed air to remove particles from the outside of each device, while using suction to remove those particles. Mice and keyboards are cleaned and every fifth one is tested beyond watching for errors when the CPU and monitor are tested. If the equipment works as expected, Taveras puts a green sticker on it – every piece. The company handled several buildings in the New York area, including the JP Morgan Chase office, he said. Mobile hepa filters and carts carrying the necessary tools are moved about the school to clean mounted projectors, wood shop electronics, the server cabinet, the intercom system, every device in the boiler room, and other stationary items.


ER Electrician Ed McCarty is in charge of cleaning the building’s electrical distribution system, including the mains and panels. Although ER personnel work in places that have suffered extensive damages, they are part of the healing process.
The three students facing charges for allegedly causing the damage are scheduled for preliminary hearings Wednesday in Warren County Court. In its 2013 Atlantic hurricane season outlook issued today, NOAA’s Climate Prediction Centeris forecasting an active or extremely active season this year. For the six-month hurricane season, which begins June 1, NOAA’s Atlantic Hurricane Season Outlook says there is a 70 percent likelihood of 13 to 20 named storms (winds of 39 mph or higher), of which 7 to 11 could become hurricanes (winds of 74 mph or higher), including 3 to 6 major hurricanes (Category 3, 4 or 5; winds of 111 mph or higher).
Three climate factors that strongly control Atlantic hurricane activity are expected to come together to produce an active or extremely active 2013 hurricane season.
NOAA’s seasonal hurricane outlook is not a hurricane landfall forecast; it does not predict how many storms will hit land or where a storm will strike. New for this hurricane season are improvements to forecast models, data gathering, and the National Hurricane Center communication procedure for post-tropical cyclones. Also this year, Doppler radar data will be transmitted in real time from NOAA’s Hurricane Hunter aircraft.
The National Weather Service has also made changes to allow for hurricane warnings to remain in effect, or to be newly issued, for storms like Sandy that have become post-tropical. NOAA’s outlook for the Eastern Pacific basin is for a below-normal hurricane season and the Central Pacific basin is also expected to have a below-normal season. NOAA’s mission is to understand and predict changes in the Earth’s environment, from the depths of the ocean to the surface of the sun, and to conserve and manage our coastal and marine resources. Multi-Purpose Dry Chemical – Typically uses a chemical agent called mono ammonium phosphate. Purple K Dry Chemical – Uses a potassium-bicarbonate-based dry chemical agent which is a nuisance and acts as a simulator to electronics causing over heating issues. Install a HEPA air scrubber to reduce, control and remove effects of airborne particulate circulating around the area of damage. Because dry chemical fire extinguishers are very corrosive especially to metal surfaces, those surfaces should be cleaned and treated first to naturalize and restore materials. Clean, rinse and dry as well as bake as needed all technical contents in batch processing method using correct chemistry for each substrate. Confirm proper operation after the commissioning of equipment and prior to handing over to the client. Warning: We always test substrates for chemical reactivity, etching, softening of substrates and colorfastness. From printed circuit boards, chocolate molds, carburetors to precision instruments of all types, Electro-Mechanical Recertifiers, Inc. Our method is safer, faster, less expensive and more effective than traditional hand cleaning, pressure washing or chemical treatments. Non-toxic ultrasonic cleaning bubbles eradicate even microscopic grime in the tiniest crevices, outperforming conventional hand scrubbing with harsh chemicals.
Mobile cleaning lab and our industrial parts cleaning tanks are large enough to handle any job. Our technicians have experience with cleaning expensive alloys, metals and composite materials of all shapes and sizes. Using this method you’ll improve the quality of your products, increase production times, efficiency and decrease your impact on the environment.
They also explore how disaster preparedness can help to reduce the impact of disasters and build hope and resilience for the future. How does it differ from what you have listed?Prepare a survival kit of things you might take if you had to leave your classroom or house in a hurry because of fire or some other disaster.Assist your teachers to organise a fire drill. Boulder County will have 16 Voter Service and Polling Centers open throughout the county on Election Day with some of those locations opening as early as two weeks before Election Day. Members of the Executive Board of the County Clerk's Association will finalize the scholarship awards by May 1, 2015. There are no restrictions as to the course of study or training which may be pursued, and no restrictions are placed upon applications by reason of race, creed, age, gender, or national origin. Applications will be reviewed by a local committee appointed by Sheriff Pelle, and a selection will be made on the basis of criteria established by CSOC. Since then, this effort has continued as a meaningful expression of the sheriffs’ confidence in and respect for education and training.
For more information, contact your local high school, college, County Sheriffs of Colorado, or the Boulder County Sheriff’s Office.
At this point, challenges to the election of candidates to office or the result of a ballot issue election are allowed only in narrow circumstances, such as fraud or corruption that could change the result of the election. In the 2010 gubernatorial race, candidate Tom Tancredo of the American Constitution Party received more than 10% of the vote statewide, the American Constitution Party (ACN) earned “major” party status until the next gubernatorial election, this year.
This was in spite the fact that there were no significant discrepancies in the audit or in the reconciliation reports. There was previously an election rule allowing a county clerk to certify local election results when the canvass board failed to certify.
Boulder County used the state prescribed audit process which randomly selects the scanning systems, the electronic machines and the contests which to audit.
Our election vote reconciliation and audit show that the Boulder County election results are accurate.
Colorado currently has three major parties: American Constitution, Democratic and Republican. They have tried for years to get the courts or the legislature to change the way election canvass boards conduct their business, but have been unsuccessful in their attempts.
Our office recommends that if you need a printed title immediately, that you either come in prior to the upgrade on Friday, November 7 or afterwards on Wednesday, November 12.
Beginning on Monday, November 3, seven additional Voter Service and Polling Centers will be available to service voter needs. If you need to register to vote, update your registration information, request a replacement ballot, or vote using equipment or facilities for people with disabilities, please visit a Voter Service and Polling Center. Those positions have been filled by the Republican Party Chair and any additional interested individuals must contact the party.
No mail ballot is ever processed and counted without a bipartisan team of election judges verifying that the signature on your ballot envelope matches the signature on your voter registration record.
Drive-by ballot drop-off locations open in Boulder, Longmont, Louisville, and a new walk-up station in Erie. Sometimes people use jargon to be deliberately obtuse or perhaps make something simple seem complex. Virtually all computer users have lost or deleted files on their personal or work machines at some point. The number of versions of a file or the retention time of files is set within the data retention policies configured within the backup application or process. After a disk crash, system failure or physical disaster, all systems will need to be rebuilt and configured from scratch and only then can the data be loaded onto the systems.
This is used only in very high capacity systems (credit card processing, stock market etc), has distance limitations (~60 miles) and will rarely be encountered at the customers we usually deal with. When the replication method is asynchronous, there is a delay (typically seconds to minutes) from when the data is written on the originating system until it is sent to the secondary system and no acknowledgement of receipt of the data by the secondary system is required. The key to understanding where replication fits in your DR or BC plan is that replication is a (more or less) live copy of the original data, so when the original file or folder is deleted or corrupted, that deletion or corruption is also replicated to the failover system.
The goal of Disaster Recovery is to get the IT assets of an organization up and running within a specified time parameter and with a specified limit to the amount of data lost.
The goal of Business Continuity is the continual availability of critical business functions to customers and suppliers, and this goal is met by implementing standards, programs, and policies that are implemented on a day-to-day basis to maintain service, consistency, and recoverability. An organizations reaction to events we would not associate with DR, such as BP’s oil spill in the Gulf, the Bhopal accident in India, or a plane crash that takes the life of the CEO are covered by implementation of a proper BC plan. Each organization needs to look at its budget, how much lost data and downtime that it can realistically afford and make its decision accordingly. In reviewing these events, the Environmental Protection Agency (EPA) identified several areas where the country could better prepare itself in the event of future terrorist incidents.
The EPA Homeland Security Laboratory Capacity Workgroup consists of representatives from the Office of Research and Development (ORD), Office of Air and Radiation (OAR), Office of Water (OW), Office of Solid Waste and Emergency Response (OSWER), Office of Environmental Information, Office of Pollution Prevention and Toxics, and several EPA regional offices. Machinery, electrical equipment and computers that are adversely affected need a fast track recovery plan.
Water and the accompanying contaminates carried in through the roof rain water, firefighting suppression, rising flood waters and storm surge can cause immediate fire, explosion and shorting resulting in upstream and downstream damages to other system components, cabling and wiring as well as other equipment installed or electrically attached equipment. It’s a reconceptualization of the OS that aspires to unify Apple’s vision of hardware and software into a holistic experience, and it’s the result of the new era of collaboration at the company that began last year with the ouster of former iOS chief Scott Forstall and the elevation of Jony Ive to SVP of design. So when we say “Recovery” or “Continuity” we have to drill down further to specify for whom this is referring to. But consider the fact that something this definition overlooks is the process and procedures involved in restoring from a backup.
Without that piece of the puzzle, backed up data that can’t be legibly visible would just take up space. Some items may corrode from the secondary effects of the flooding just by being in non-climate controlled conditions and being exposed to high moisture meaning relative humidity has reached condensing levels or the dew point has beenexceeded meaning these items have been exposed much higher levels of humidity than designed and energizing them without a thorough analysis of the effects of corrosion may result in premature failure. It is voluntary for a healthcare organization to submit to a JCAHO inspection (a high grade confers prestige), but the JCAHO does not have enforcement power and also does not consider business recovery during the inspection. The cooperative plan, known as Firescope, produced a management system that has become standard operating procedure across the United States – Incident Command System (ICS). This work served as the cornerstone of the original version of HEICS (1991) developed by Orange County Emergency Medical Services.
One facility in Virginia’s Clarion Health System, CRCH, was closed for 16 days as the result of a fire. In some instances, documentation is required to demonstrate compliance with standards and elements of performance (EPs). At the time of the fire no one knew the extent of the loss and this took some time to grasp the damage. First by providing initial emergency services and then working with their insurance carrier and consultants to provide a construction scope and estimate for the project. We dispatched project managers and emergency crew members to provide for immediate site containment and electrical safety concerns. Chocolate was melted on and in equipment, bulk chocolate destroyed, as well as numerous finished goods.
During the restoration process, reporters showed up at various stages, vendors arrived to help and clients who had not heard of the loss on the news had arrived for plant tours or ice cream parlor outings. They were very concerned about key staff leaving, extended rebuild times and the ability to phase in sections or areas of the buildings. Their experts included inventory specialists, forensic accountants, building consultants, salvage companies and engineers. The new electrical codes as well as structural loads and fire code issues had to be addressed in the scope. We recognized our good standing with the client early on and embraced the partnership of working together to meet their goals and objectives.
Leading them to address all questions through a POC for the client or a project manager who can distribute the information to all parties helps manage the process and make it more efficient.
This estimating and tracking of additional requirements and costs is important to the project’s success. At this time DRS would set goals for selections of materials and provide completion dates of certain tasks so Sarris Candies could prepare themselves moving forward.
Architectual drawings and engineering services can be strenuous activity that stalls progress because the process must be fast tracked.
If necessary, the electronics can be dried in a heating cabinet or washed in the ultra-sonic acid wash.
In the case of computer CPUs, each case is opened and the same process applied to the interior. Forecasts for individual storms and their impacts will be provided throughout the season by NOAA’s National Hurricane Center.
In July, NOAA plans to bring online a new supercomputer that will run an upgraded Hurricane Weather Research and Forecasting (HWRF) model that provides significantly enhanced depiction of storm structure and improved storm intensity forecast guidance. This will help forecasters better analyze rapidly evolving storm conditions, and these data could further improve the HWRF model forecasts by 10 to 15 percent. This flexibility allows forecasters to provide a continuous flow of forecast and warning information for evolving or continuing threats. NOAA will issue an updated outlook for the Atlantic hurricane season in early August, just prior to the historical peak of the season. Carbon dioxide extinguishers leave no residue and are commonly used in computer rooms and food storage areas. Switches, contacts, circuited boards, power supplies and ports must be preserved until they can be treated.
We follow all cleaning compound label directions, and we never mix products unless specified in the label directions and batch tested first. More importantly, by using our affordable compounds of water-based soaps and enzyme solutions instead of spray solvents and toxic cleaning products, you’ll save the environment and 70% or more from harsh chemical use. What is the actual replacement cost versus restoration cost if quick uptime is not a factor? Do you have a business continuity or resumption plan for your IT recovery in the event of a disaster? Typically following well written plans will most likely result in the quickest recovery time possible.


Small groups could each focus on one photo, then present the image and their ideas to the whole group and lead a class discussion.What kind of disaster caused the damage shown?What does the photo make you think about regarding the impact of disasters on people and the environment?What kinds of help might people need when these disasters occur? Note what happens during the drill and discuss how effective this would be if there really were a fire. In fact, since taking office, Secretary Williams and I have already met and spoken several times at length, and while our parties may differ, our dedication to administering proper and fair elections is aligned. CSOC considers this an investment in the future and believes that our membership is helping to provide deserving students with an opportunity to make a positive contribution to society. Additionally, the final Statement of Vote, a document that shows precinct-by-precinct results for every candidate and issue on the Boulder County ballots this year, will be forwarded to the Colorado Secretary of State’s office to become part of the official statewide election record and is available now online. Despite this pre-calculated political action, the Boulder County Elections Division anticipates that the Colorado Secretary of State’s office will accept the results of the election as they did after both the 2012 General Election and 2014 Primary Election when similar political action was taken by a Canvass Board (see below for background details). In Boulder County, like every other clerk office, we simply follow election law when conducting our canvass. The Elections Division also has several drive-by ballot drop-off locations where voters can turn in their mail ballot without even exiting their car.
With the opening of these locations, that brings the total number of Voter Service and Polling Centers servicing the public to 13 within the County. Visitors will be able to observe workers processing ballots for the Tuesday, November 4 General Election. So make sure to sign your ballot envelope as you normally would – then check to make sure we received your mail ballot by visiting BoulderCountyVotes.org.
Avoid the rush and visit one our Voter Service and Polling Centers this Saturday from 9 a.m. Many organizations have regulatory requirements such as HIPAA, SOX, FDA Title 21 CFR Part 11, etc.
Distance limitations and not a concern for asynchronous replication and it can be performed over a VPN connection on the public Internet as well as MPLS and Point-to-Point connections. A critical area identified by the workgroup was the need for a list of analytical methods to be used by all laboratories when analyzing homeland security event samples and, in particular, when analysis of many samples is required over a short period of time. EPA’s Standardized Analytical Methods for Environmental Restoration Following Homeland Security Events (SAM) provides information for analytical methods to be applied during the “Site Remediation” phase. ER Inc also provides technical and engineering consulting reports.  Call our toll free day or night for emergency services   877-378-4183. In an effort to limit losses and expedite business resumption, ER has such a program in place.
Left untreated and to dry slowly causes oxidation of the contaminates present resulting in corrosion of base metals. As programs are basically just combinations of files that are packaged together and reliant upon each other. Some applications require a specific start up sequence or a process and procedure involved in order for the data or application to work.
Any deviation from the original source of where the data originated could be a point of contention of stability and liability. If energized during the event the affected equipment and machinery may have sustained damage to the circuit breakers, in-line fuses, motors and main fuses which may have “blown and shorted” from the initial onslaught of water infiltration. The upgraded device is consistent with new equipment standards and technological advancements without disturbing the primary enclosure, incoming and outgoing cable connections, or operating controls. It is not clear at this time which agency will be the enforcement arm of the federal government for HIPAA.
Business recovery is different in that it considers what happens when the emergency response triage period of 24 or 48 hours is over. They have patients to protect, keep safe and possibly move, and new ones to care for as a result of the disaster. In other situations, documentation may help the reviewer determine if requirements are met; however, the standards and EPs do not require the organization to have material available in writing. The February 3, 2012 fire had affected the main operation center of the 50 year old candy manufacturer. Once the building was secure from the elements ,we were able to make building, equipment and inventory assessments jointly with the client to determine items affected and levels of damage. This was a very public business that had a great reputation and wanted to be back in business. In saving these moulds it was an estimated cost savings of $1.2 million dollars to Travelers Insurance.
This need had to be first recognized and then addressed to keep this goal as a priority for our team. As is typical there were daily changes and some stumbling blocks but because we established a rapport and understood the client objectives they treated us like a true partner and team member from beginning to end of the project. There were 10 ER employees on site Tuesday; as many as 20 will be involved in the process at the height of operations. Very little residue is left however the event causes a blown down or release that moves operational dust and covers all surfaces with dust. Consideration for shipping, removal, proper disposal, conjuration, set ups and software installation costs as well as mapping, cabling and racking costs must be studied. Write some statements about what can be done to reduce the risk and impact of disasters.Share what you have learnt about disasters with other classes and the broader school community. I look forward to having a strong working relationship with Secretary Williams and his staff and am confident that our offices will have much improved communication.Last December, in the midst of closing out an election (which is an extremely detailed process), the now former Secretary of State Scott Gessler issued a report on our office practices. Additionally, Boulder County’s election had no documented discrepancies in the audit or the reconciliation that impacted the outcome of any contest. Nothing in Colorado law states that a canvass board’s decision not to certify the county’s abstract of votes nullifies the election of county candidates or decisions on county or local ballot issues.
As of October 31, in Boulder County, the Republican Party represents 46,316 active and inactive voters, the Democratic Party represents 101,259 active and inactive voters, and the American Constitution Party represents 313 active and inactive voters. During this time, business at the Clerk and Recorder’s office Division of Motor Vehicle will be conducted as usual on Monday, November 10, except for a few small changes (Note: County offices will be closed on Tuesday, November 11 for Veterans Day). Any citizen who has resided in Colorado at least 22 days may register and vote, just visit any Voter Service and Polling Center and don’t forget to bring your ID.
Having standardized methods would reduce confusion, permit sharing of sample load between laboratories, improve data comparability, and simplify the task of outsourcing analytical support to the commercial laboratory sector.
Extensive experience with equipment restoration allows us to provide unparalleled response. However specific mitigation and emergency services steps must be taken to preserve this equipment. A solution (if it is financially feasible) would be to have an exact duplicate of the originating system on hand. I think the right way of asking these questions would be “What is an acceptable time frame for recovery?
The second onslaught of damage to electronics is “ongoing and continues” even as the water recedes. Electrical wiring, motors, computers, motor starters, contactors and control cabinets received contaminates from the flood water (ground water and salt water from flooding is very contaminated) this water contains chlorides, sulfides, heavy metals, hydrocarbons and other biological inhibitors and environmental waste chemicals that are unhealthy, toxic and corrosive. The business continuity plans that start implementation at the time of the disaster come to fruition while the triage period is happening, enabling the recovery of critical business functions and supporting information technology within the specified Recovery Time Objective (RTO). Conversely, the Harvard School of Public Health suggests that every dollar invested in disaster preparedness yields savings of $4–$11 in disaster response, relief and recovery. In those instances, the HCSS firm will demonstrate compliance with the standards and EPs by using other methods. The Sarris Candies corporate facilities are located just south of the city of Pittsburgh in the Washington County town of Canonsburg.
The fire damaged the plant including portions of the main production facility, the ice cream parlor, the retail store and the general business offices. The client was very personable and carefully worded all press releases and news interviews.
The company started on Monday, July 22, and Project Coordinator Dan Rafferty expects the work to take three to four weeks.
This could be an imagined interview with someone directly involved in the program that includes comments quoted in the case study. For example, you could prepare an article for the school newsletter, a speech, a play or a web-based presentation. As I stated at the time, I was extremely disappointed in the accusations in the report and the manner in which Secretary Gessler released the report with no interaction with my office.
A final report is issued to the Boulder County Canvass Board for verification prior to election certification. It is unfortunate and frankly a disservice to the voters of Boulder County that once again the Canvass Board chose to operate outside the boundaries of their duties as outlined in law and rule. Services available include: same-day voter registration and voting, in-person voting, ballot drop-off, replacement ballots, and voting using equipment and facilities for person with disabilities.
Standardized methods would also improve the follow-up activities of validating results, evaluating data, and making decisions.
Without the proper systems, applications, operating systems, hardware, or even situational environments: data will only be valuable in the environment it is created and used.
I know of various high finance high stress corporations that swap out systems on the fly that are matched pairs. Disaster Recovery and Business continuity do go hand in hand, but they can conceivably work independent of each other. As the water recedes the stainless, copper, aluminum and plain steel substrates of micro-circuitry and electrical components which have been covered in contaminated water continue to oxidize from the contaminates in the water as the oxygen hits the contaminated metallic surfaces which increases corrosion exponentially. In healthcare, business recovery planning by definition has an automated systems focus and works with the information technology dependent business functions in the planning process. According to FEMA’s Hurricane Ike Impact Report, the facility lost $276 million in revenue after Hurricane Ike as a result of closure of the hospital’s facilities and the resulting downtime of business operations.
The cause of the fire was deemed electrical but had also affected a large section of the roof structure, the first and second floor production areas and smoke had infiltrated 60% of the building before being extinguished.
Bill Sarris and management staff of Sarris Candies as well as various insurance representatives and consultants for an initial and ongoing plan.
This also required large amounts of our time and expertise to help the navigate their specific questions, document the damages and understand the insurance coverage and limits. A flash drive is used to run PC Doctor software on all CPUs that fail to boot to determine if the problem is the setup or something more serious. Hard to replace, harder to recover and even harder to re-create- data is costly work product. If resuming business operations ASAP is a priority then restoration of IT systems makes sense! Our process after each election is to spend a lengthy period of time examining our practices and how they can be improved upon.
To this end, workgroup members formed an Analytical Methods Subteam to address homeland security methods issues. We serve both union and non-union clients; working with strategic partners to bring together the most respected and experienced experts in the industry.
Electrical powered gear, components and distribution equipment can be deemed safe as of a specific point in time.
But in a scenario where the application and files needed “float”, making a backup could conceivably exist in the same physical area.
Do you have any leased items and anything that requires remote access or third party involvement?” Also “What amount of data can rely on to stabilize your company? Any organization not showing due diligence in starting this process will be in noncompliance.
Medical care can be provided without computers or technology of any kind in triage mode, but in a matter of days when the emergency response phase is winding down, dependency on information technology increases because the goal is to return to as close to normal operations as possible.
It was clear that the Sarris priorities were about retaining their employees during this time and filling their various customer obligations much more than profits. Time to replace with new computers, installations and networking can be done over time and phased in later as a planned project. Building wiring can also be tested using Insulation Resistance Testing to NETA standards ensuring the building compotes and combined systems are safe. There are many aspects that are involved in recovery that happen before and after system restoration. This legislative mandate has a strategic goal of reducing costs in healthcare by standardizing data processing, as a prelude to establishing a centralized clearinghouse for claims processing, similar to the financial industry. Imagine the difficulty in scheduling appointments over a diverse and geographically dispersed healthcare system without information technology. If this is the only place your data is located then restoration can be extremely cost effective. What does this add to your understanding of disasters and ways to help?Create a ‘disasters’ web map or word cloud to summarise the key ideas from all your discussion so far (eg about effects, kinds of help needed).
And remember, Boulder County also has three 24-Hour Ballot Drop Boxes open every day, 24-hours a day, until 7 p.m.
Just as Business continuity may or may not be affected by a disaster (though typically it is, it’s not a constant actuality). The financial industry is highly regulated and audited for business recovery capability by both the federal and state governments. Websites to help with creating word clouds include Wordle and Word it out.Revisit and add to this graphic as you continue your investigation of disasters.



Emp protection devices india
Power outage northeast usa


Comments to “Disaster preparedness issues in the philippines”

  1. Bratka writes:
    Running parallel to the hammock, and use this the identical continuity Of Operations Strategy. Wise.
  2. VUSALE writes:
    Out bag (furthest away from your orbit, showed bizarre instrument cross bars simply because the.
  3. GaLaTaSaRaY writes:
    Outside with our topographic maps of the region.