Barn door hardware gta,building small garden shed plans,post and beam barn wisconsin,backyard barn shed plans pdf - Reviews

05.09.2014


When a lot of people want a new and unique way to get different views of every room of your home. So while I hurt my back, I thought I would show you some of my inspirations for the second floor bathroom and hallway. Along with this I am contemplating adding a transom window above to add some additional light. I know it is a major trend right now, but I decided to give Turkish or Fouta or Peshtemal towels a try. We also finally brought down and assembled the elliptical machine, which has been sitting in various locations for the past 7 years waiting for a home. As you can see part of the basement is looking pretty cleaned out (this is where they were storing a lot of their stuff). The other side of the main room is currently filled with extra stuff from the construction process, things that need to be installed (i.e. The workroom is now drywalled and I can’t wait to install our new workbench in the bay window. I love this Salvaged Wood Shelf from West Elm, but I don’t love the price, especially since I would need 3 or 4. In the meantime my contractors will be back on Monday to finish studding and drywalling the work room, so we have lots of clean up to do, and we need to temporarily move a bunch of stuff to around to get it done. I’ve been busy since this photo was taken but you can get a general idea of how the laundry area flooring is coming along. The good news is that once we discovered it, my contractors came right over and dried it out and fixed the leak (which oddly took 48 hours to show up).
Last night I managed to slog through and install the grout in my faux slate vinyl flooring (TrafficMaster Ceramica Resilient Vinyl Tile in Coastal Gray).
My contractors have been cranking away here in the bathroom today and we already have a working sink and shower (although the final brackets still need to go in).
Still on the to do list is the beadboard ceiling in the second space (aka the future pantry), floor leveling and miscellaneous trim. It was a long slog this weekend in the basement (especially with such lovely weather outside).
Step 6A (Plan B): I ran to the store and picked up vinyl adhesive (which I have used before).
We recommend that you adjust the color barn doors with your personal and your home’s walls. We are in the midst of a stomach bug epidemic, so life has been moving a little more slowly than usual.  The contractor was just here to go over moving the master bedroom door, discuss options for the bathroom door and the handrail and show him the plans for the electric. He did think my linen closet was ridiculously small (hey, I don’t have one, so any closet no matter how small is an upgrade). I had been eying a different ceiling fan but I saw this one (Acqua Ceiling Fan II in Textured Bronze) for a great price on Joss & Main and decided to go ahead and order it. We have been trying to get the third floor cleared out enough that we can it insulated shortly.
I am conflicted between a pocket door (more historically accurate) and an exposed rail system. We won’t be gutting anything major here, but I really like the side medicine cabinet that her husband created. I am thinking that a small one near the toilet would be perfect for extra toilet paper and other unmentionables.
I actually tried them years ago when I was in college and visiting Istanbul for a few days while studying abroad. I have been seeing them pop up on a number of the sale sites and in some of the catalogs I get in the mail.
For the brackets I gave up waiting for the ones I wanted that are now backordered until August and ordered these rust ones  from VanDykes instead. Of course all of our basement does not look like this, since we do have our fair share of stuff (which needs to be organized). I haven’t decided whether we should reuse the Ikea shelving that we have or possibly install heavy duty metal wall shelves. My kids are super excited about hunting for eggs and it looks like the weather is going to cooperate for us! I think we are going to hold off on the carpet until that work is done, between the storage and the drywall dust. My contractors are mostly done and it is up to us to get somethings finished before they come back. This will house an under counter fridge and freezer, as well as our antique Victorian safe. I think it looks awesome (especially considering that they had to attach it on either side without puncturing the insulation behind it). It is a beautiful coral color and I think it will look nice with my vase and be good for holding miscellaneous toiletries or towels. I was hoping to give you a good tour of the progress today but we had a water leak on the solder joint for the hot water line to the sink yesterday morning. The bad news is that several of the vinyl tiles needed to come up and we need some more leveling compound in the bathroom before we can reinstall the tile. We were hoping to get a start tonight but the leveling compound will most likely still be damp.


I think it looks fairly convincing and it was certainly less expensive and thinner than using real slate.
I can’t say I am a big fan, but they do not recommend the typical dry grout that you mix with water. I stepped in joints several times while I was cleaning the joints with a sponge and it got on my feet and pants leg.
If I had this to do over again I would have pulled the tiles out of the boxes and had them sit out where it was a little warmer.
This includes leveling (our contractor used a self leveling product and ground down the high spots with an old school stone). So while I was picking up the adhesive I had also realized that the door trim went all the way to the floor, so I couldn’t get the tile underneath. You can open one of the doors and the door remains closed, or those of you who want a light and fresh air more fit into your home. Since we are going to be working on this wall I thought it would be nice to add some light into the corridor from the bathroom. We will have to use some sort of latch to lock it, since the door isn’t thick enough for a locking mechanism. The hallway is a bit dark since the only natural light comes from the stained glass window and the surrounding rooms. We can’t install one behind the sink since it is an outside wall, but we could put on on the side wall (behind the new sliding door). I couldn’t believe how pricey they were ($40-60 a piece), although they are super colorful with fun patterns.
I have more, and will probably eventually add 2 more shelves above the toilet area (and move the picture). I just need to find a better spot for the liquid soap, so the kids don’t try and reach up to the shelf (and potential knock the vase over).
In the meantime the mirror behind the elliptical machine will hopefully get hung in the bathroom tonight.
They will actually be back in a couple of weeks to finish some baseboard trim and a few other small items, but it is strange to have basement back. I also have plans for hanging an old mirror and can’t wait to bring in some colorful accessories. I think I may put the Ikea ones in for now, since they are here and free and decide if I need to upgrade from there. I’ve already done 1 load of laundry and after I put it in the washer I stood there staring at the bathroom for a few minutes. I found similar metal brackets at VanDykes, but they are on back order until at least next month. But the good news is that they will be done with almost everything by next week, so we can actually finally get things finished down there. Our contractors were great and managed to move it a few feet to its new location (it weighs about 1000 lbs). It still needs to be whitewashed but it is really nice to come down the tight stairs and have this on the wall. It ended up leaking overnight and we had a good bit of water on my brand new floor and into the newly drying leveling compound at the washer and dryer area. A Moen 4 Function Handshower, Single Handled Kingsley Lever, Posi-Temp Pressure Balanced Valve and a Drop El to connect the handshower to the wall. I found the grout to not be as sticky as I would like and yet at the same time it really stuck to my hands. I can’t say how excited I am about the concept of actually being able to see my laundry! It still needs a couple of coats of paint to finish it off, but it really helps finish off the space.
We ran into some issues with the floor, so I didn’t get quite as far as I would have liked. Once the floor was level we used a floor prep product for concrete flooring (recommended by the manufacturer). For the straight cuts you just score it with the utility knife a few times and then you can snap it with your hands.
After getting the tile lined up I carefully removed the backing of the tile and placed it down. I had read the reviews of the tile and more than one person had used the vinyl adhesive without problem (to ensure good adhesion).
Please join me in the adventures of renovating old homes while trying to raise our young modern family. Overall this space is going to be a bit more eclectic and industrial then some of our other spaces in the house. I’m a little nervous though that even if it is cool, it might not be quite right for the house.
But what finally convinced me to give them a try was reading a review of them on House*Tweaking.
They are suppose to get more absorbent the more they are washed, so we will see how I feel about them in a couple of months. This has been re-thought as the space has come together and quickly become a summer living room (thanks to the early summer weather).


I may have to sand down the pegboard first, which I am a little bummed about (it currently has screws perfectly placed in a grid and looks so perfect). There is still lots to do, including more painting (the ceiling and soffit), shelving to the right of the washer and dryer and more storage but it totally functional and even has new stainless steel hoses to minimize the chance of a leak. If all goes well my contractor is going to stop by tomorrow and put on washer and dryer into place (which is why I am busting my you know what to get it finished). In the past the parged foundation wall was visible here.  Another great thing about this area is that we have a light right at the bottom of the stairs, so no (okay less) tripping while carrying stuff up and down the stairs. It had been sitting up on our 3rd floor for the last 9+ years, so it is great to see it back in use.
And it looks like I will be installing the grout on Monday night again, so we can get the washer and dryer back in place on Tuesday. The brick wall in the picture is on a 45 degree angle and is for the fireplace in the kitchen above.  We will be mounting a TV on it (there is an outlet in the ceiling for us). This makes the floor slightly sticky and ideal for making the tile stick (or at least it is suppose to). I also wanted to make sure that we ended at a full tile where the laundry area meets the main space, so I carefully measured back from there. For more complex cuts I scored the shape and carefully pulled down with the need nose vise grips right next to the cut (on the bad side). Our first floor tends to stick much closer to the Victorian feel, but upstairs I think it is okay to have a little fun.
Although we do now have an extra newel post to install at the railing to allow the door to pass behind it and over the staircase.
They seemed stiff (possibly starched) at the time and not at all luxurious (of course I was staying at an inexpensive hotel not really made for tourists). Fortunately the couch should still fit okay, although for anyone staying over, you will have an exercise machine looming over you. Of course this doesn’t mean we are done, we still have lots of painting to do, carpet to install and decorating but we can at least move forward on the cosmetic stuff, which is a big deal.
I can’t even say how excited I am to get the washer and dryer back in place with the new floor. This worked quite well, although sometimes took several turns to get all of the unused portion off.
That was actually quite therapeutic, and it feels good to get a good bit of clutter out of the space. The last step will be giving up my garage space in the coming days to store some of vast piles of stuff while the work is done. We have problems in the summer with the towels drying out properly, which leads to going through a lot of towels and spending more time then I would like ensuring that they are washed properly to get the mustiness out. If all goes well we will get at least part of the carpet in this weekend, along with some trim painting. I plan on outlining some of them in permanent marker so that they can go back where they belong after using. We also have some more painting to do (mostly the ceiling) before we can put the carpet tile in.
The smaller water tank allows for the toilet to sit closer to the wall by a couple of inches, which makes a big difference in a small bathroom. I will also be putting in some grout sealer after I get the laundry area finished to help the grout lines stay clean. We were lucky that all of the walls were perpendicular (I checked and rechecked) so I could cut the tiles all the same depth for the back wall and work out from there.
Of course our playroom and garage are almost full and we still have one closet in our bedroom that will require emptying and demolishing. And frankly most of my choices could be changed to something more traditional fairly easily.
I am also thinking that I need to get a water sensor for the washer and dryer area to alert me if there is ever a leak.
I am thinking that we may be installing our bedroom closets piecemeal so that we can continue to function. I think my favorite part is the nice texture of the cotton.  They hang nicely and up close the weaving is very pretty. If anyone is using the self adhesive tiles, I do recommend additional adhesive, especially in a concrete installation like ours.
Unfortunately after we get this area  finished, we will have to temporarily use it as a dumping ground for the workroom, so that they can drywall that space.  Phew, and I said we were in the final push! I also picked up a turquoise one for the pool and to use as a wrap, which I think will be a much needed stylish upgrade.
So then I started warming the tiles up by holding them up to the heater in the ceiling, hoping that would help.
It did help but I was still noticing than some of them were not adhering as well as I would like! I also have been mulling around a couple of ideas for a backsplash (which is why there is plywood instead of beadboard on the wall).




Costco bike shed
Tiger sheds log cabins 900x900


Comments »

  1. EmO_GiRl — 05.09.2014 at 16:45:30
    For example, a plastic spherical container colors with radical designs.
  2. ILQAR007 — 05.09.2014 at 20:40:20
    Determined the price of materials supplies vital for the job compact.