Best Practice Guide

Glossary

Introduction

Planning an Energy Program

Funding and Approval

Education

Lighting

Central HVAC System

Procurement Policy

Building Envelope

Demand Response

Distributed Generation

Water Use

Motors

Food Service

Resources and Appendices

Lessons Learned

Best Practice Guide Glossary

Search the glossary by keyword:


Browse the glossary alphabetically:


PREFERRED SCHEDULE Return to list of terms

The initial schedule produced by a Scheduling Coordinator that represents its preferred mix of generation to meet demand. The schedule includes the quantity of output (generators) and consumption (loads), details of any adjustment bids, and the location of each generator and load. The schedule also specifies the quantities and location of trades between the Scheduling Coordinator and all other Scheduling Coordinators, and is balanced with respect to generation, transmission losses, load, and trades.

Source: California Energy Commission